Each utility’s reliability statistics can be found in their annual reliability reports filed with the NY PSC.

Central Hudson’s planned reliability and resiliency projects can be found in the 2025 Annual Electric Reliability Report filed with the NY PSC (Case 26-E-0017).
Granularity: Circuit

Con Edison’s planned reliability and resiliency projects can be found in the 2025 Annual Report on Electric Service and Power Quality filed with the NY PSC (Case 26-E-0017).
Granularity: Circuit

National Grid’s planned resiliency and reliability projects can be found in the 2025 Annual Electric Reliability Report and 2025 Annual Electric Reliability Report filed with the NY PSC (Case 26-E-0017). The report can also be found on the System Data Portal under the tab ‘Company Reports’.
Granularity: Circuit

NYSEG's planned reliability and resiliency projects can be found in their 2025 NYSEG Annual Reliability Report filed with the NY PSC (Case 26-E-0017).
RG&E's planned reliability and resiliency projects can be found in their 2025 RGE Annual Reliability Report filed with the NY PSC (Case 26-E-0017).
Granularity: Circuit

O&R’s planned reliability and resiliency projects can be found in their 2025 Annual Service Performance Report filed with the NY PSC (Case 26-E-0017).