Each utility’s reliability statistics can be found in their annual reliability reports filed with the NY PSC.

Central Hudson’s planned reliability and resiliency projects can be found in the 2024 Annual Reliability Report filed with the NY PSC (Case 25-E-0031).
Granularity: Circuit

Con Edison’s planned reliability and resiliency projects can be found in the 2024 Annual Report on Electric Service and Power Quality filed with the NY PSC (Case 25-E-0031).
Granularity: Circuit

National Grid’s planned resiliency and reliability projects can be found in the 2024 Annual Electric Reliability Report filed with the NY PSC (Case 25-E-0031). The report can also be found on the System Data Portal under the tab ‘Company Reports’.
Granularity: Circuit

NYSEG's planned reliability and resiliency projects can be found in their 2024 Annual Reliability Report filed with the NY PSC (Case 25-E-0031).
RG&E's planned reliability and resiliency projects can be found in their 2024 Annual Reliability Report filed with the NY PSC.
Granularity: Circuit
O&R’s planned reliability and resiliency projects can be found in their 2024 Annual Service Performance Report filed with the NY PSC (Case 25-E-0031).