Each utility’s reliability statistics can be found in their annual reliability reports filed with the NY PSC.
Central Hudson’s planned reliability and resiliency projects can be found in the 2022 Annual Reliability Report.
Granularity: Circuit
Con Edison’s planned reliability and resiliency projects can be found in the 2019 Reliability Performance Mechanisms filed with the NY PSC.
Granularity: Circuit
National Grid’s planned resiliency and reliability projects can be found in the 2018 Annual Electric Reliability Report filed with the NY PSC. The report can also be found on the System Data Portal under the tab ‘Company Reports’.
Granularity: Circuit
NYSEG/RG&E’s planned reliability and resiliency projects can be found in their 2018 Annual Reliability Report filed with the NY PSC.
Granularity: Circuit
O&R’s planned reliability and resiliency projects can be found in their Service Reliability Report for 2018 System Performance filed with the NY PSC.