Each utility files an Electric Reliability Report each year with the New York State Public Service Commission. Click on the links below to download PDFs of the reports.
Granularity: Varies by project

Central Hudson’s planned reliability and resiliency projects can be found in the 2019 Annual Reliability Report filed with the NY PSC on March 31, 2020.

Con Edison’s planned reliability and resiliency projects can be found in the 2016 Annual Report on Electric Service and Power Quality filed with the NY PSC.

National Grid’s planned resiliency and reliability projects can be found in the 2017 Annual Electric Reliability Report filed with the NY PSC. The report can also be found on the System Data Portal under the tab ‘Company Reports’.

NYSEG/RG&E’s planned reliability and resiliency projects can be found in their 2017 Annual Reliability Report filed with the NY PSC.

O&R’s planned reliability and resiliency projects can be found in their Service Reliability Report for 2017 System Performance filed with the NY PSC.